Cane Island
- Clear and grub entire 120 acre site
- Excavation of Two detention basins totaling 380,000 CY
- Installation of 2’ clay liner at bottom of both ponds
- All excavated material spread and compacted across 120 acre site
- Storm Drain installation within ponds
- 8’x8’ box culvert installation
- Seeding and slope stabilization
- Concrete sloped paving